| Project | Lummi Island Breakwater Replacement |
|---|
| Location | Bellingham, WA |
|---|
Project Summary
This project consisted of replacing two deteriorated timber pile breakwaters at the Lummi Island Ferry Terminal. Γλ²₯ Construction removed 140 creosote timber piles and replaced them with steel piles with sheet pile webbing and new timber piles.