Γλ²₯
Skip to Main Content
Contact
About
Equipment
Γλ²₯
Γλ²₯
Equipment
About
Contact
News
System Wide On-Call Off-Shore Maintenance
Back to Γλ²₯
Project
System Wide On-Call Off-Shore Maintenance
Date
2022-2025
Location
Various
Project Summary
Perform maintenance and repairs to ferry terminal wingwall and dolphin structures at 12 locations throughout the Puget Sound ferry system on an on-call basis.